.LOG

AT Day’s start: On Board
At Day’s end  : /SigningOff… Otsukare-sama desu.


8:38 2010/08/02 ==> 8:15a - 12p, 1p - 6p [9]
TimeTraker.
*** NEED to SUBMIT CR for projecT!!~! [still don’t have submit access]
Chased on all my unresolved ticket request: toolkit-lic.app push  &  CR permissions.
Meeting with Efrain on my "Perform Review.
Troubleshooting for Sachin’s website issue.


8:38 2010/08/03 ==> 8:15a - 5p, 5:45p - 8:15p [11.5]
Worked on the PowerPoint doc for UI proj.
Updated LEQ’s PC with new useragent.
Continued with analyst of inventory and PC breakdown list.
Finished compiling all the numbers for PC inventory and breakdown lists.
Finished the 1st draft of my UI proj#2 PPT file.
20:11 2010/08/03


19:14 2010/08/04 ==> 8:30a - 7:45p [11.75]
ReRan the numbers again to include all 4.5 and 4.6 PCs for HW refresh.
Updated the presentation for UI project.
Meeting with Efrain - UI project
Troubleshot Sachin’s ebbsspot.com login issue – needed to install additional software
Advised Tomomi-san on her login lockout issues.
Finished building John Gorman’s replacement PC. He started testing it.
Chased HP on broken PCs.
Help Gupta with PC monitor.
19:32 2010/08/04


9:29 2010/08/05 ==> 8:45a - 12p, 1p - 7:15p [9.5]
Built new PC for Gupta-san
Submitted CR for September rollouts.
Chased Package team for Pete.M’s clientTools2005 issue.
SD weekly meet.
worked with the gateway guys to collect the remaining 4.0 PCs from 9th floor.
Installed Gupta’s new PC and reclaimed his existing z400.


8:51 2010/08/06 ==> 8:30a - 12p, 1p - 8p [11.5]
Begun the rollout prep’s.
Chased John.G. and Wada-san on 4.0PCs
Built new PC for Carl Bosley.
Meeting with Gateway-Murakami-san
Installed John Gorman’s new 4.6PC
Rebuilt all of Tim.Berlett’s 5xPCs to 4.6
Worked with HP to repair 2x z400 PCs.


8:54 2010/08/09 ==> 8:30a - 1:30p, 3p - 7:30p [9.5]
TimeTraker.
Network scan - 4.0PC count increased to 8!!! WTF!
Started building PCs!!  Prep’ing for migrating users.
Chased on remaining 5 4.0PCs.
Built new PC for RENDESR (replace 4.0)
Meeting with Gateway - Got my engineers!!! yea!
NOTIFIED upgrade users…
Swapped Stephen Rendell’s 4.0 box.
***  NEED to automate email notification to users!!!


21:00 2010/08/10 ==> 10a - 2p, 3p - 9:15p [10.25]
Chased on my 4.0 users.
Troubleshoot issues with trader’s PC.
Began creating script to automate email notification…
NOTIFIED upgrade users…
UI team meet
Rolled out 6 PCs to 4.6
Ran through my schedule for this week – rearranged as needed.
21:10 2010/08/10


22:31 2010/08/11 ==> 10a - 2p, 3p - 10:30p [11.5]
User Notify. PC builds. PC deployments x 5.
Chased on remaining 4.0 boxes. Wada-san & Ogura-san.
Removed one phantom 4.0 box from the trade floor.
Updated schedule per user requests
DataWall PC troubleshooting


21:02 2010/08/12 ==> 10a - 1:30p, 3p - 9p [9.5]
Finished creating my automated notification system for rollouts!!!
Troubleshot issues with PDF toolbar on IE7(GWD4.6) – taught user how to CTRL P…
User Notify. PC builds. PC deployments x 2.
Installed 3rd monitor for Simon Holland.
troubleshot build issue for 99619 (ONOHA-san) replacement pc.


0:36 2010/08/13 ==> 9:45a - 1:30p, 3p - 7p, 9p - 00:45p [11.5]
User troubleshooting and rescheduling.
User Notify. PC builds.
Prep’d PC deployments. Took 14 PCs to Atago for spare and install.


00:00 2010/08/14 ==> 3p - 6p [3]
Deployed 6 PCs @ Atago. Rebuilt Aika’s PC ** will return tomorrow to install



15:20 2010/08/15 ==> 2p - 3:30p [1.5]
Deployed 3x PCs@SMC and 1x @Atago


12:55 2010/08/16 ==> 10a - 13:30, 14:30 - 24:30p [13.5]
User troubleshooting and rescheduling.
User Notify. PC builds.
GateWay engineers arrived!


13:21 2010/08/17 ==> 10a - 13:30, 14:30 - 24:30p [9.5]
User troubleshooting and rescheduling.
User Notify. PC builds.
Swapped out Wada-san’s old PC! (finally)


22:08 2010/08/18 ==> 10:45a - 10:15p (no lunch) [11.5]


00:00 2010/08/14 ==> 10a - 11p (no lunch) [13]


15:02 2010/08/20 ==> 10a - 6:15p (no lunch) [8]


17:01 2010/08/22 ==> 4p - 7:45p [3.75]
SMC & Atago deployments
19:39 2010/08/22


21:04 2010/08/23 ==> 1p - 10:30p [9.5]
User notifications. PC prep. User troubleshooting.
Atago deployments – DHCP problem! Contacted networking team.


22:27 2010/08/24 ==> 12p - 12:45a [12.75]
User notifications. PC prep. User troubleshooting.
Meeting with Carl over PRS rollouts.
SMC deployments. Old PC collection.
*Defered Atago deployments for tomorrow - due to lack of time.
Requested Network team to assist in finding 2 more PCs…
0:40 2010/08/25


13:53 2010/08/25 ==> 12p - 4:15p, 5p - 10:30p [9.75]
User notifications. PC prep.
User troubleshooting.
Old PC collection.
Network team refuses to assist in finding PCs…


12:34 2010/08/26 ==> 12p - 11:30p [11.5]
User notifications. PC prep.
SD weekly meet.
Atago deployments. HR room map update
Hunt&seek PCs @ SMC!.. :\\ BAD MAP


11:42 2010/08/27 ==> 12p - 6p [6]
PC prep.


13:59 2010/08/30 ==> 12:45p - 6:15p [5.5]
TimeTraker.
Yokohama Planning.
18:14 2010/08/30